俟命
Yancheng, Jiangsu Province, the ecological source of drinking water purification project Is mainly responsible for data collation, preparation of feasibility study report of the mission and the ecological water line mapping 2. CNOOC Gas (Taizhou) Co., Ltd. Taizhou Petrochemical CNOOC an asphalt oil projects Primarily responsible for field investigation, data collection, as well as environmental impact assessment report (Standard) of the preparation of 3. Jiangsu Province, the coastal areas of regional development planning Is mainly responsible for the environmental impact report and revise the job of drawingYancheng city in jiangsu province of drinking water purification ecological engineeringMainly responsible for material, the feasibility study report writing task and ecological water is drawingCnooc gas (2) petrochemical Co., LTD, taizhou taizhou cnooc asphalt oil phase projectMainly responsible for on-site investigation, information collection and the eia report (draft) written approval3 coastal areas of jiangsu province regional development planningMainly responsible for the environmental impact statement of drawing and modification